[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]
gEDA-user: Verifying connections in PCB?
PCB gurus,
I am editing a PCB design I created some months ago. I made some mods
to my schematic, re-ran gsch2pcb, imported the changes (both
footprints and netlist), put down teh new footprints and re-drew the
tracks.
Now I think I am done with the board. With a new board PCB
will pop up a "routing complete" message when all connections are
made. However, I am not getting that message, even though I see no
rats anywhere.
When I run the DRC checker I get the message "no DRC errors". But if
I delete a trace and run the DRC checker I also get the message "no
DRC errors". Therefore, the DRC checker apparently isn't checking
connectivity.
So my question: is there a way to verify that all connections in the
netlist are made? I did a little searching and found no info, but
perhaps the PCB power hackers know how to do this.
BTW: I am running version 20060822, GTK HID.
Thanks and cheers,
Stuart
_______________________________________________
geda-user mailing list
geda-user@xxxxxxxxxxxxxx
http://www.seul.org/cgi-bin/mailman/listinfo/geda-user