[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]
[or-cvs] r16076: Make the last two sentences of the mid-July report sound les (website/trunk/projects/en)
Author: kloesing
Date: 2008-07-19 10:01:31 -0400 (Sat, 19 Jul 2008)
New Revision: 16076
Modified:
website/trunk/projects/en/hidserv.wml
Log:
Make the last two sentences of the mid-July report sound less scary.
Modified: website/trunk/projects/en/hidserv.wml
===================================================================
--- website/trunk/projects/en/hidserv.wml 2008-07-19 13:52:09 UTC (rev 16075)
+++ website/trunk/projects/en/hidserv.wml 2008-07-19 14:01:31 UTC (rev 16076)
@@ -209,10 +209,11 @@
<a href="http://archives.seul.org/or/dev/Jul-2008/msg00034.html">developer
mailing list</a> including 7 possible design changes that need to be
discussed. Some evaluations (namely Low-Bandwidth Measurements and the
- Grand Scaling Plan) will be scheduled for a later time in the
- project. Although the current plan is to perform these evaluations
- within the timeframe until January 15, it is unlikely that their
- results can be applied in the schedule of this project.</em></small>
+ Grand Scaling Plan) have turned out to require more time than expected
+ and had to be scheduled for a later time in the project than
+ deliverable B. The current plan is to perform these evaluations within
+ the timeframe until January 15 and work with assumptions until final
+ results are available.</em></small>
</td>
</tr>