[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]
[or-cvs] [metrics/master] Mark August items done, add more items for September.
Author: Karsten Loesing <karsten.loesing@xxxxxxx>
Date: Tue, 8 Sep 2009 12:17:17 +0200
Subject: Mark August items done, add more items for September.
Commit: 5b2722a319ccc531e14f5a6b77410efc515facbe
---
TODO | 50 ++++++++++++++++++++++++++++----------------------
1 files changed, 28 insertions(+), 22 deletions(-)
diff --git a/TODO b/TODO
index cb3a700..48c92eb 100644
--- a/TODO
+++ b/TODO
@@ -97,23 +97,33 @@ Tasks for July:
Tasks for August:
- . Evaluate Roger's reduced circuit window patch
+ o Evaluate Roger's reduced circuit window patch
+ o Compare 40 and 50 KiB downloads.
- - PETS 2009
-* - Aug 5-7: Attend conference, plus 4 days travelling.
-
- - HAR 2009
-* - Aug 13-16: Attend conference, plus 2 days travelling.
+ o PETS 2009
+* o Aug 5-7: Attend conference, plus 4 days travelling.
- - Configure Mike's bandwidth scanner on gabelmoo
- - Include measured bandwidths in votes
+ o HAR 2009
+* o Aug 13-16: Attend conference, plus 2 days travelling.
- . Statistics proposal (include dirreq/entry/buffer/exit statistics in
+ o Statistics proposal (include dirreq/entry/buffer/exit statistics in
extra-info documents)
- . Implement proposal
- - After receiving a HUP signal, don't print out that stats will be
+ o Implement proposal
+ o After receiving a HUP signal, don't print out that stats will be
written in 24 hours from then on.
- - Include patch in git master
+ o Include patch in git master
+
+ o Cells in circuit queues
+* o August 31: Write report on measured cell stats data; analyze results
+* for "1.2, new circuit window sizes. make the default package window
+* lower" and "2.1, squeeze loud circuits" in performance roadmap.
+
+---------------------------------------------------------------------------
+
+Tasks for September or later:
+
+ . Configure Mike's bandwidth scanner on gabelmoo
+ . Include measured bandwidths in votes
. Exiting traffic by port
* . July 31: Evaluate data together with Steven. Write report on measured
@@ -127,23 +137,19 @@ Tasks for August:
- Client requests to directories
- Compare bytes.txt output to dirreq download times
- - Analyze directory requests by end of July which are running for about
- two months by then.
- Figure out why estimations are that far off. Where is the flaw in the
math?
- . Cells in circuit queues
-* . August 31: Write report on measured cell stats data; analyze results
-* for "1.2, new circuit window sizes. make the default package window
-* lower" and "2.1, squeeze loud circuits" in performance roadmap.
-
- Clients connecting to entry nodes
* - July 31: Write report on measured entry stats data.
----------------------------------------------------------------------------
-
-Tasks for September or later:
+ - Circuit build timeouts
+ - Find out why there are bumps at full seconds even though seconds start
+ at random times on the relays; possibly measure full distributions of
+ cell times in circuit queues, not just the deciles.
+ - Evaluate Roger's reduced circuit window patch
+ - Switch to 1 MiB downloads
- Work organization
- Add medium and low priority items from Roger's performance mail to
this list, too. This list contains only the two high priority items.
--
1.5.6.5