[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]
Re: gEDA-user: modified net "L" drawing [ was Topics discussed ... ]
Hi Ales (and all),
I'm interested to check your new "L knitting", i.e., build from the CVS
but...
Can you please check in the configure scripts too?
The FreeBSD port collection only includes:
autoconf-2.13, autoconf-2.53, autoconf-2.59
automake-1.4.6, automake-1.5, automake-1.9.6
On an up to date FreeBSD geda releases build easily.
Thanks, Enoch.
Ales Hvezda wrote:
>[snip]
>
>
>>The existing rubber banding only places one wire with each left click.
>>In the situation you describe I would expect the extra net to be
>>rubber-banded but not placed.
>>
>>
>>
>
> Agreed. And to that end, I have checked in code changes (to CVS)
>to the net "L" drawing along these lines:
>
> * If you draw an "L" and no connections are encounted (on either
> the first or second net), then both nets are added/drawn.
>
> * If you draw an "L" and a connection to an existing net/bus/pin
> is encountered at the endpoint of the first net, then only that
> first net is added/drawn and the whole process continues from
> that existing connection location.
>
>These changes are in CVS now, so if people want to play with these
>changes... please let me know what you think.
>
> -Ales
>
>