[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]
Re: gEDA-user: next PCB release - 1.99za vs 4.0
> ...but your number of "sub-composites" grows exponentially. In
> theory, whatever the lowest-level composite is, your sub-composite
> set is the power set of that!
No, because fabs can't drill that way. You can't have a copper layer
that's part of two separate sub-assemblies before those sub-assemblies
are assembled to each other.
Let's say we're doing the top half of an 8-layer board...
copper ----- 1 top
fr4 ===== 2
copper ----- 3
fr4 ===== 4
copper ----- 5
fr4 ===== 6
copper ----- 7
fr4 ===== 8 center
Now, depending on how the fab makes it, determines what combinations
of buried vias are possible. For example, if the fab makes
two two-sided boards and glues them to a core, you get this:
copper ----- 1 --
fr4 ===== 2 ][
copper ----- 3 --
fr4 ===== 4
copper ----- 5 --
fr4 ===== 6 ][
copper ----- 7 --
fr4 ===== 8
Thus, you can via from 1-3 or from 5-7, but not 3-5 because you never
have 3/4/5 as a separate drillable unit. Thus, the composite is:
((123) 4 (567) 8 ...)
Blind and micro vias are just special cases of this. You'd sub-composite
the top copper/fr4 so you could list drills there:
(((12) 3) 4 (567) 8 ...)
_______________________________________________
geda-user mailing list
geda-user@xxxxxxxxxxxxxx
http://www.seul.org/cgi-bin/mailman/listinfo/geda-user